SmartStructure Prefab Framing

Precision-engineered prefab and panelized framing that shortens build timelines, increases accuracy, and saves money on multi-family and commercial projects.

Prefab/Panelized/Engineered/Calgary, AB

Engineering the Future of Framing

SmartStructure moves construction from the chaotic job site to the controlled precision of our manufacturing facility. We build structural wall and floor panels to exact tolerances, then crane them into place on site, so builders reach lock-up in days instead of weeks.

Visit the SmartStructure Website

10–14Days

To Full Lock-Up

<2%

Jobsite Material Waste

50–75%

Faster Completion

82%

Less Overall Waste

Why Prefab

Factory Precision

Every panel is built to millimeter tolerances in a climate-controlled facility, delivering accuracy that site-building cannot match.

Reduce Waste

The factory is engineered to eliminate waste. By cutting off-cuts at the source, we pass those material savings back to the builder.

On-Site Speed

Panels are delivered just-in-time and craned directly into place, standing up multi-family buildings in as little as 10 to 14 days.

From Factory to Foundation

Multi-family build, craned into place
Multi-family build, craned into place
Panels delivered in-time
Panels delivered in-time
Precision panel installation
Precision panel installation
Finished multi-family homes
Finished multi-family homes

Prefab vs. Stick Framing

Key FeatureSmartStructure PrefabTraditional Stick Framing
TimelineUp to 50 to 75% faster project completion.Standard sequential construction with a slower framing phase.
Labor CostSmaller specialized crews and fewer man-hours per square foot.Highly dependent on regional skilled-trade availability and rates.
Material WastePrecision factory cutting; under 2% jobsite material waste.Typically 10 to 15% jobsite waste from onsite measuring and cutting.
Weather RiskMinimal; the structure is dried-in within days of arrival.High; the structure is exposed to the elements for several weeks.
Quality ControlClimate-controlled factory precision with rigorous inspection.Dependent on onsite craftsmanship and field inspection.

Estimated Savings Calculator

Adjust your project details to see the estimated time and cost reduction of switching to prefab panel construction.

sq ft
50050,000

Estimated Days Saved

28Days

Waste Reduction

82%

Interest Savings

$16,800

Estimates based on regional averages for 2024 construction costs and labor availability. These values are illustrative and vary by project complexity and local conditions.

The SmartStructure Process

01

Manufacturing

Precision structural panels are built to your drawings in our climate-controlled facility.

02

Delivery

Panels arrive site-ready and on schedule, delivered just-in-time to the jobsite.

03

Assembly

We bring our own crane and stand the structure up in a fraction of traditional framing time.

Get Started

Ready to Start Your Project?

Tell us about your project. We will get back to you within one business day with a free written estimate.

Your information is private. We do not share or sell your contact details.